luni, 24 septembrie 2012

New Terrain Construction


The hills surrounding the C segment are starting to take shape. Just on the bottom of the picture, that space, containing 2 holes in the foam baseboard, will have to be covered by a mobile lid. The same kind of "cover", but a larger one, will have to be used to the left of the vertical (in this photo) divider, while the part to the right will have fixed terrain, supporting the Viessmann model cow that just arrived. Seen in the second photo - although that's not the final position since it will have to move further to the back and to the right - the cow has a really natural movement and, as a bonus, Viessmann also throws in a separate, static cow to hold company.
  The small sharp edge next to the bridge was designed specifically so that some infrared emitors/detectors can be hidden inside the steep hill that will result. One of the detectors, 61 (segment 6, detector 1), is visible right to the left side of the Brawa long car.

Niciun comentariu:

Trimiteți un comentariu