luni, 10 septembrie 2012

Drilling and Plans

 In the unlikely event that the current layout will be electrified at one point, it's going to be hard installing the overhead wire in the tunnel, even though a "cover" is being manufactured now. So with the plastic masts from the Viessmann tunnel overhead system glued in place using some Bison solution, tonight I went ahead and drilled 2 holes at each extremity of the brass strip, as indicated in the Viessmann manual, in the event that overhead wire will have to be connected.
  In a completely separate process, I'm also trying to make a sketch of how the PT segment will look like next to the Faller station. I also ordered a Viessmann yard lamp (6384) that I'm thinking will make some nice lighting effects, especially during nighttime.

Niciun comentariu:

Trimiteți un comentariu