Things went ahead with the recent test board, up to the point were the rock has been integrated with the surrounding foam pieces, track and ballast has been fixed, rock pieces have been placed near the rock, and grass planting has started. The talus doesn't look quite right at this moment, but I think a black wash will fix this. Grass still needs to be planted, both on the slopes near the rock and in the front of the line (where the big boulder inside the mould lies). Also more drybrushing will have to be done to the track, since using black weathering powder tends to lose that "depth" of the wooden rail tie. Some patches of earth will remain exposed, as to show the nice texture that zip texturing - the method used to generate the soil - does so good. The complete building procedure will of course be available as soon as the board is ready.
The last photo is done using 6 consecutive images, taken with different focus settings, and processed in Helicon Focus.
Niciun comentariu:
Trimiteți un comentariu