duminică, 23 decembrie 2012

Right Corner

The Noch tunnel lining has been extended, so that the white foam can be covered due to issues examined before. This seen here is the one covering the IR detector (for which the hole seen in the bottom left exits). The small trimming in the upper left corner is due to one of the piers of the tunnel overhead system.
At the same time that the lining was glued in place, the right corner was prepared for the plaster cloth.The one I had left fitted exactly for the 2 layers needed, and now I'm awaiting a shipment containing 3 rolls (Woodland Scenics C1203).




Niciun comentariu:

Trimiteți un comentariu