luni, 15 august 2011

Retaining Wall - Take 3

The technique discussed last time was varied a little, and so the final black wash was no longer applied to the whole area, but instead just a few zones, as well as the drybrushing, slightly more powerful in some parts, medium in others and none sometimes. The idea was to brake the "monotony" of the bricks, that was still there even after color randomization, black wash and concrete drybrush.
The photo is taken under natural light, the "land" is actually the first test board, while the Noch retaining wall was placed in the back (right now, even it's not visible in the photo, it's already curved, in preparation to setting it up on its final spot on the big board). A small patch of miniNatur summer ivy was used (936-22S), while the dining car is an ancient PIKO WR ge, built in the 80s.
For that detailed close-up look, just click.

Niciun comentariu:

Trimiteți un comentariu